[1]
Hartawan, A.S., Witjaksana, B. and Wulandari, E. 2024. Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1). International Journal of Social Science and Community Service. 2, 4 (Aug. 2024), 277–284. DOI:https://doi.org/10.70865/ijsscs.v2i4.11.