(1)
Hartawan, A. S.; Witjaksana, B.; Wulandari, E. Acceleration Cost Analysis With Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1). IJSSCS 2024, 2, 277-284.