[1]
A. S. Hartawan, B. Witjaksana, and E. Wulandari, “Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1)”, IJSSCS, vol. 2, no. 4, pp. 277–284, Aug. 2024.