1.
Hartawan AS, Witjaksana B, Wulandari E. Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1). IJSSCS [Internet]. 2024Aug.5 [cited 2025Mar.11];2(4):277-84. Available from: http://ijsscs.com/index.php/journal/article/view/11