Analysis of Cost Acceleration Using Time Cost Trade Off Method on Wheat Silo and Pellet Silo Phase III Structure Repair Project in Surabaya
Main Article Content
The Wheat Silo and Pellet Silo Structural Repair Project Phase III in Surabaya holds great significance in the wheat flour processing industry in Indonesia. PT Indofood Sukses Makmur Tbk Bogasari Surabaya Division, one of the leading wheat flour producers, required structural repairs on both silos to ensure smooth plant operations and final product quality. The project necessitates proper project management to avoid delays and cost overruns, with a budget of Rp. 28,011,000,000 and an estimated duration of 455 calendar days. This study employs the Time Cost Trade-Off (TCTO) method to analyze options for accelerating the project timeline by considering additional costs that may arise. The results showed that by using TCTO, the project completion time can be accelerated to 359 days from 455 days, reducing the duration by 21.10% at an additional cost of Rp. 739,351,125.00 or 2.64% of the project value. With the addition of 1 hour of overtime per day, the cost of accelerating the project is Rp. 413,445,000.00 or 1.48% of the project value, reducing the work time to 391 days or 14.07% of the original schedule.
Abdilah, M. T., Puspita, I. A., & Tripiawan, W. (2021). Perancangan Waktu Dan Biaya Proyek Rehabilitasi Sekolah Menggunakan Metode Cpm Dan Time Cost Trade Off. EProceedings of Engineering, 8(6).
Abdillah, M. G., & Kurniawan, S. (2022). Anal?s?s Metode T?me Cost Trade Pada Pembangunan Perpustakaan Ia?n Metro. Jumat?s?: Jurnal Mahasiswa Teknik Sipil, 3(1), 211–218.
Afrizal, A. I. (2018). Time Cost Trade Off Analisys Untuk Pengoptimalan Waktu dan Biaya Proyek (Studi Kasus: Pembangunan UPT Puskesmas Karangpucung).
Akbar, Y. R. (2022). Penentuan Jalur Kritis untuk Manajemen Proyek (Studi Kasus Pembangunan Jalan Selensen-Kota Baru-Bagan Jaya). Jurnal Pustaka Manajemen (Pusat Akses Kajian Manajemen), 2(1), 6–13.
Anggraeni, D. N., Nugroho, M. W., & Sumarsono, S. (2019). Optimasi Waktu dan Biayacrashing dengan Menggunakan Metode Time Cost Trade Off. Civilla: Jurnal Teknik Sipil Universitas Islam Lamongan, 4(2), 310–317.
Ariesty, A., & Nauval, M. R. (2020). Analisis Penerapan Metode Jalur Kritis pada Proyek Pembangunan Gedung Pengelolaan RTH Cangehgar. JTERA (Jurnal Teknol. Rekayasa), 5(1), 2019–2025.
Ashari, N. F. (2023). Analisis optimasi waktu dan biaya proyek dengan metode time cost trade off dan fast track pada pekerjaan penanganan longsor. Jurnal Proyek Teknik Sipil, 6(2), 21–29.
Hermansyah, H., Umar, T. D. J., & Rasdiati, R. (2022). Pemanfaatan Bonggol Jagung Sebaga? Bahan Tambah Dalam Campuran Beton. Jurnal Kacapuri: Jurnal Keilmuan Teknik Sipil, 5(1), 131–139.
Mariani, R., & Witjaksana, B. (2019). Anal?s?s Crash?ng T?me Menggunakan Ms-Project Dalam Pelaksanaan Pekerjaan Pada Proyek Pen?ngkatan Jalan.”. SpTS: Jurnal Spesialis Teknik Sipil.
Nugroho, D., Marleno, R., & Tjendani, H. T. (2023). Optimasi Waktu Dan Biaya Proyek Revitalisasi Pasar Kraton Kota Tegal. Jurnal Spesialis Teknik Sipil (JSpTS), 3(1), 24–41.
Pramesti, H. R., & Listyawan, A. B. (2023). Analisa Pengendalian Waktu dengan Metode Critical Path Method (CPM) pada Proyek Pembangunan Pondok Iqro’, Surakarta. Prosiding Seminar Nasional Teknik Sipil UMS, 560–566.
Pratiwi, R., Devi, S. M., Marini, A., & Sari, H. M. (2022). Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off (Tcto) Pada Proyek Penambahan Bangunan Pasar Rakyat: Time And Cost Optimization Using The Time Cost Trade Off Method In The People’s Market Additional Building Project. Jurnal Ilmiah Teknik Sipil Transukma, 4(2), 93–105.
Sulistyo, A. B., & Al Fikri, M. (2021). Anal?s?s Opt?mal?sas? Waktu Dan B?aya Proyek Konstruks? Menggunakan Metode T?me Cost Trade Off. Jurnal Intent: Jurnal Industri Dan Teknologi Terpadu, 4(1), 25–40.
Sulistyo, A. B., Kusdianto, A., & Wirawati, S. M. (2023). Analisis Manajemen Proyek dengan Sistem Umbrella Contract Menggunakan Metode Time Cost Trade Off (Studi Kasus: PT Jaya Inti Teklindo). Jurnal Penelitian Dan Aplikasi Sistem Dan Teknik Industri (PASTI), 17(1), 43–57.
Vebiola, N. E., & Waskito, J. P. H. (2020). Anal?s?s Opt?mas? Waktu Dan B?aya Dengan Metode T?me Cost Trade Off (Studi Kasus: Proyek Pembangunan Basement Kawasan Balai Pemuda). Axial: Jurnal Rekayasa Dan Manajemen Konstruksi, 8(2), 113–120.
Waney, E. V. Y., & Ruitan, S. M. (2022). Perencanaan Waktu dan Penjadwalan Pelaksanaan Proyek Pembangunan Rusun TNI di Minahasa Utara. Prosiding Seminar Nasional Produk Terapan Unggulan Vokasi, 1(1), 290–295.
Zanri, I. F., Santosa, A. W. B., & Mulyatno, I. P. (2023). Optimalisasi Penjadwalan Ulang Perbaikan Kapal Hiu Macan Tutul 02 dengan Menggunakan Metode CPM. Jurnal Teknik Perkapalan, 11(1), 72–78.