(1)
Analysis of Cost Acceleration Using Time Cost Trade Off Method on Wheat Silo and Pellet Silo Phase III Structure Repair Project in Surabaya. Int. J. Soc. Sci. Community Serv. 2024, 2 (3), 136-142. https://doi.org/10.70865/ijsscs.v2i3.24.