(1)
Acceleration Cost Analysis With Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1). Int. J. Soc. Sci. Community Serv. 2024, 2 (4), 277-284. https://doi.org/10.70865/ijsscs.v2i4.11.