“Acceleration Cost Analysis with Critical Path Method: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Construction of Wastewater Sewers in Area 1-1)”, Int. J. Soc. Sci. Community Serv., vol. 2, no. 4, pp. 277–284, Aug. 2024, doi: 10.70865/ijsscs.v2i4.11.