[1]
L. Nailufar, B. Witjaksana, and E. Wulandari, “Analysis of Cost and Time To Complete of Office Project with The Earned Value Method: (Case study: Office of Bahtera Elang Perak Indonesia Surabaya)”, IJSSCS, vol. 2, no. 4, pp. 246–254, Aug. 2024.