Performance Analysis on Road Implementation Project Based on Time and Cost
Main Article Content
Effective time management is essential for ensuring project implementation aligns with the planned schedule, and one way to achieve this is through the use of Earned Value Analysis (EVA). EVA is employed to estimate the extent to which a project is progressing according to its work plan. This research aims to analyze the timeline of a road construction project using the Earned Value Analysis Method to estimate the final project completion time on a monthly basis. The methodology employed in this study involves the application of the Earned Value Method over a project duration of 18 months. The importance of the Earned Value Analysis Method lies in its ability to assist both the project owner and implementer in more easily analyzing the project's performance, thereby providing significant benefits for both parties. The study found that the project completion time did not align with the initial project schedule. Specifically, the calculation of the cumulative project completion time was 9 months, whereas the planned duration was 18 months. This indicates a delay of 7 months beyond the planned schedule.
Alfathan, M. F. (2021). Penerapan Analisis Konsep Nilai Hasil di Proyek Pembangunan Sarana Prasarana Radar Pasif STT Natuna dengan menggunakan Program Primavera P6.
Anjani, A., Nugroho, M. W., Sundari, T., & Ramadhani, R. (2023). Anal?s?s Proyek Pembangunan Jembatan Pelabuhan Pat?mban Menggunakan Metode Earned Value. Jurnal S?p?l Sa?ns, 13(2).
Ayatullah, M. A., Syafrudin, S., & Sarmingsih, A. (2023). Analisis Manajemen Waktu Pada Proyek Pembangunan Jalan Parang Garuda East Kawasan Industri Kendal. Jurnal Profesi Insinyur Indonesia, 1(3), 88–92.
Cahyono, B., Witjaksana, B., & Tjendani, H. T. (2022). Anal?s?s Manajemen R?s?ko Pelaksanaan Proyek Pembangunan Jalan Tol Manado-B?tung Seks? 2 STA 14+ 067–39+ 700. Senakama: Prosiding Seminar Nasional Karya Ilmiah Mahasiswa, 1(1), 57–66.
Dharmawan, R. D., Safarizki, H. A., & Firdausi, A. A. (2023). Evaluasi Efektivitas Keputusan Addendum Proyek Terhadap Waktu Pekerjaan Proyek Berbasis Earned Value Method. J@ Ti Undip: Jurnal Teknik Industri, 18(1), 51–61.
Gerung, J. O., Dundu, A. K. T., & Mangare, J. B. (2016). Analisa Penerapan Manajemen Waktu Pada Pembangunan Jaringan Daerah Irigasi Sangkup Kiri. Jurnal Sipil Statik, 4(7).
Nono, Y., Pratasis, P. A. K., & Malingkas, G. Y. (2019). Analisis Metode Nilai Hasil Terhadap Waktu Dan Biaya Pada Proyek Office and Distribution Center, A?rmad?d?, M?nahasa Utara-Manado. Jurnal Sipil Statik, 7(11).
Nufah, Y. W., Yanti, G., & Lubis, F. (2019). Analisis Proyek Dengan Metode Earned Value Concept (Studi Kasus Pada Proyek Pembangunan Jalan Tol Ruas Pekanbaru–Dumai Seksi 2 Sta. 9+ 500–33+ 600). Prosiding Seminar Nasional Cendekiawan, 1–59.
Pabalik, C. P., Walangitan, D. R. O., & Pratasis, P. A. K. (2018). Analisis Nilai Hasil Terhadap Waktu Pada Proyek Konstruksi.(Studi Kasus: Pembangunan Gedung Laboratorium Fakultas Teknik Universitas Sam Ratulangi). Jurnal Sipil Statik, 6(11).
Permana, A. P. (2022). Penerapan Anal?s?s Konsep N?la? Has?l Pada Proyek Pembangunan Gedung D?nas Perhubungan Surakarta Menggunakan Apl?kas? Pr?mavera P6.
Sari, H. M., Hendriyani, I., & Widyaningrum, A. E. (2021). Earned Value Analysis pada Proyek Pembangunan Gedung Arsip Kantor BPN: Earned Value Analysis of BPN Office Archives Building Projects. Jurnal Ilmiah Teknik Sipil Transukma, 3(2), 154–167.
Wicaksono, R. M. B. (2021). Analisis kinerja biaya dan waktu menggunakan metode earned value pada Proyek Pembangunan Infrastruktur Laboratorium Tradisional Food GMP Facility (Paket 3). Akselerasi: Jurnal Ilmiah Teknik Sipil, 3(1).
Winarto, T. J. (2021). Analisis durasi proyek x dengan metode earned schedule. Jurnal Dimensi Pratama Teknik Sipil, 10(1), 82–89.